Boreas
2011-05-08 12:12:49
So I've been instructed to build a monster PC. It's not for video editing, or serious gaming (but some gaming), it's a personal computer for work and play. Needs to be fairly quiet, last for years, allow for upgrades, and multi-task well. Also, it needs to be built and paid for in stages. Here is my initial thinking for stage 1.
http://www.amazon.com/THERMALRIGHT-SILVER-ARROW-DUAL14CM-HEATSINK/dp/B003XRAKLQ
http://www.amazon.com/Lamptron-Speed-Controller-channels-Silver/dp/B002RC09HS
http://www.sidewindercomputers.com/arcomxthco2.html
http://www.sidewindercomputers.com/pa12hisp.html
Motherboard:
http://www.newegg.com/Product/Product.aspx?Item=N82E16813131704
http://www.newegg.com/Product/Product.aspx?Item=N82E16813131701
http://www.newegg.com/Product/Product.aspx?Item=N82E16811119225
http://www.newegg.com/Product/Product.aspx?Item=N82E16819115073
http://www.newegg.com/Product/Product.aspx?Item=N82E16820227590
http://www.newegg.com/Product/Product.aspx?Item=N82E16822152238
http://www.newegg.com/Product/Product.aspx?Item=N82E16832116992
http://www.newegg.com/Product/Product.aspx?Item=N82E16827135204
http://www.newegg.com/Product/Product.aspx?Item=N82E16820231424
http://www.newegg.com/Product/Product.aspx?Item=N82E16814125357
http://www.newegg.com/Product/Product.aspx?Item=N82E16817139014
OS on the SSD, data on the HDD (single/RAID1 at first, RAID10 eventually).
The machine this will be replacing is getting a RAM upgrade in the meantime, and will then become an Amahi server when the monster is up and running (for backups).
It might have to be toned down a bit for stage 1, and end up spending more on later stages. For example, the PSU doesn't need to be that much initially, but going with a lower one now would mean getting another one later, and ending up with a spare (which could actually be a good thing with an identical motherboard and lower everything else to make a donor machine).
So, any suggestions for ramping up stage 1? And for toning down? Any suggestions later upgrades?
http://www.amazon.com/THERMALRIGHT-SILVER-ARROW-DUAL14CM-HEATSINK/dp/B003XRAKLQ
http://www.amazon.com/Lamptron-Speed-Controller-channels-Silver/dp/B002RC09HS
http://www.sidewindercomputers.com/arcomxthco2.html
http://www.sidewindercomputers.com/pa12hisp.html
Motherboard:
http://www.newegg.com/Product/Product.aspx?Item=N82E16813131701
http://www.newegg.com/Product/Product.aspx?Item=N82E16811119225
http://www.newegg.com/Product/Product.aspx?Item=N82E16819115073
http://www.newegg.com/Product/Product.aspx?Item=N82E16820227590
http://www.newegg.com/Product/Product.aspx?Item=N82E16822152238
http://www.newegg.com/Product/Product.aspx?Item=N82E16832116992
http://www.newegg.com/Product/Product.aspx?Item=N82E16827135204
http://www.newegg.com/Product/Product.aspx?Item=N82E16820231424
http://www.newegg.com/Product/Product.aspx?Item=N82E16814125357
http://www.newegg.com/Product/Product.aspx?Item=N82E16817139014
OS on the SSD, data on the HDD (single/RAID1 at first, RAID10 eventually).
The machine this will be replacing is getting a RAM upgrade in the meantime, and will then become an Amahi server when the monster is up and running (for backups).
It might have to be toned down a bit for stage 1, and end up spending more on later stages. For example, the PSU doesn't need to be that much initially, but going with a lower one now would mean getting another one later, and ending up with a spare (which could actually be a good thing with an identical motherboard and lower everything else to make a donor machine).
So, any suggestions for ramping up stage 1? And for toning down? Any suggestions later upgrades?